View of Pump House construction at Aguasabon Generating Station located by Terrace Bay Ontario. Construction was completed by 1948 with costs totaling $12,755,000.
View of Pump House construction at Aguasabon Generating Station located by Terrace …
Photo of a crane used in the construction of Hayes Lake Dam, Terrace Bay, Ontario. Blue Jay Lake levels were raised 21m to create Hayes Lake, a 680ha headpond for the Aguasabon Generating Station. Th
Photo of a crane used in the construction of Hayes Lake Dam, …
A look at the Aguasabon generating station tunnel located in Terrace Bay, Ontario. In 1946, the town of Terrace Bay approved the construction of Hayes Lake Dam to provide water for Aguasabon Generati
A look at the Aguasabon generating station tunnel located in Terrace Bay, …
The finished product and the power at the Hayes Lake Dam on the Aguasabon River in, Terrace Bay, Ontario. The action for the construction of a power source, was taken in, conjunction with Ontario Hyd
The finished product and the power at the Hayes Lake Dam on …