APRIL 28, 1976 TERRACE BAY NEWS PAGE 11 McCausland Hospital Building Fund (as of Friday April 9/76) Monthly pledges (by groups) (for 24 months) K-C - Hourly $2,340.00... % 24, =. $56,172.00 K-C - Woodlands 50.00" "x: 24 = 1,200.00 K-C - Salary 300.00 'x 24. = 7,200.00 CPR Employees 350.00 =:1:24 [= 8,4C0.00 ° Birchwood Employees 24.00 x 24 = 576.00 Hospital Employees 115.00 cx 24 = 1,380.00 Recreation Employees 1000 *x '24= 240.00 St. Martin & Holy Angels «38.00: x24 i= 912.00 Terrace Bay Library 5.00... 24 = 120.00 Township of Terrace Bay 39.00 x 24 = 936.00 Personal pledges 3,650.00 3,650.00 Monthly pledges (over a 12 month period) R. G. M. $36.00. x 12 = $432.00 (not yet received) " Spadoni Employee $5.00 x 12 = 60.00 Business (local contributions) $5,000.00 Business (out of town) . Gulf 0il $1,500.00 (over 3 years) Shell 0il $1,000.00 (when construction begins) CHP. A Rail $10,000.00 (received) K-C of Canada up to = $100,000.00 (based on 40% of donations) Amount received (on this pledge) to date =.931..,281.00 Bank of Commerce up to $4,500 (based on 1% of donations) Total cash (April 9, 1976) $122,339.76 Portion of total cash invested -- $30,000.00 $80,000.00 Cash as of Friday April 15th - $127,077.26 Building Fund - Costs for a Single (bed) Bedroom and a Four-bed Room Construction Cost of a single-bed room (1 washroom) - $16,800.00 Construction Cost of a four-bed room (2 washrooms) - $55,000.00 Furnishings for a single room Bed (manual controlled) - $420.00 Safety sides - 91.00 Mattress - 58.00 Table (over bed) > - 90.00 Cabinet (beside bed) = 95.00 Chair © - 60.00 Drapes - 50.00 TOTAL: : $964.00 Furnishings for the four-bed room would have everything multiplied by 4 - a total of $3,856.00