Park Street Bridge Construction Progress
Description
- Media Type
- Image
- Item Type
- Photographs
- Description
- This photo depicts the construction progress of the new Park Street Bridge in 1970. Workers stand by as a crane lowers a beam onto the bridge.
- Notes
- Condition: A little worn and faded, otherwise good condition.
- Date of Original
- 1970
- Dimensions
-
Width: 1038 px
Height: 1039 px
- Subject(s)
- Local identifier
- 2846ph
- Collection
- St. Marys Museum Photo Collection
- Language of Item
- English
- Geographic Coverage
-
-
Ontario, Canada
Latitude: 43.25009 Longitude: -81.13304
-
- Copyright Statement
- Copyright status unknown. Responsibility for determining the copyright status and any use rests exclusively with the user.
- Recommended Citation
- "Park Street Bridge Construction Progress" St. Marys Museum, 2846ph.
- Terms of Use
- Reproduction of digital objects is restricted to fair use for personal study or research; any other use must be done with permission of copyright holder.
- Reproduction Notes
- This image is a watermarked low resolution reproduction.
High resolution images are available at the St. Marys Museum for a fee. - Contact
- St. Marys MuseumEmail:museum@town.stmarys.on.ca
Website:
Agency street/mail address:177 Church Street South,
P.O. Box 998,
St. Marys, Ontario.
N4X 1B6