  • Ear Falls Hydro Colony
        Construction of the Hydro colony began in 1937 to house employees and their families. However, when the second unit of the power plant was installed, the construction camp was built on the west side of the dam away from the Hydro colony, at the present site of the transformer yard ...
      Construction of the Hydro colony began in 1937 to house employees and ...
  • Marathon Train Station
        With the end of World War II, the men returning from the war, the men who were released from POW camps, and Europeans wishing to stay in Canada, were all well received by the town of Marathon. In this photo is the CPR depot which was under construction. In the ...
      With the end of World War II, the men returning from the ...
  • Building the Trans-Canada West of Thunder Bay (~1931)
        This photograph was taken at mile 79, just outside of Upsala. These men were from camp C9. Crews were spaced out at camps five miles apart. Each camp had about 130 workers. Building a five mile stretch of work involved tremendous manual labour and took about 3 years to complete. ...
      This photograph was taken at mile 79, just outside of Upsala. These ...