Photo du bureau dans le moulin Weyerhaeuser à Sturgeon Falls avant sa démoliton en 2004. / Photograph of the Weyerhaeuser mill office in Sturgeon Falls before its demolition in 2004.
Photo du bureau dans le moulin Weyerhaeuser à Sturgeon Falls avant sa …
The spill dams on the Sturgeon River were built in 1923-24 with a continuous pour of 5,399 cubic yards of concrete in 10 hour shifts. The municipality of West Nipissing bought the hydro dams when Wey
The spill dams on the Sturgeon River were built in 1923-24 with …
According to Abitibi records, in May 1950, two 60,000 lb./hr. 300 PSI (pounds per square inch) pieces of equipment were installed. In the same period, a new 50-ton per hour coal handling system was p
According to Abitibi records, in May 1950, two 60,000 lb./hr. 300 PSI …
Équipe de démolition de Restoration Environmental Contractors après la démolition du mouline Weyerhaeuser à Sturgeon Falls. / Restoration Environmental Contractors demolition crew after the demolitio
Équipe de démolition de Restoration Environmental Contractors après la démolition du mouline …
The Weyerhaeuser mill, located on Cache Bay Road in Sturgeon Falls, had its own water tower to generate water pressure for fire protection purposes. This water tower, along with the entire mill, were
The Weyerhaeuser mill, located on Cache Bay Road in Sturgeon Falls, had …
Une des dernières photos prise du moulin Weyerhaeuser à Sturgeon Falls. / One of last photos taken of the Weyerhaeuser mill before it was demolished in 2004. This photo was taken before a six-month c
Une des dernières photos prise du moulin Weyerhaeuser à Sturgeon Falls. / …